Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | cyclepathlighting, solarstud |
Date time: | 2.44pm, Friday 4th July, 2014 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | soundandfury |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
One of the solar studs being tried out on the shared use path across Lammas Land. They have been installed on the section that goes past the tennis courts but no further.
Comments reflect the views of the original submitter only.