Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 8.56am, Friday 4th March, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | doctorrad |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Matt |
Area: | Bristol |
Cycle access ramp / trough to bridge
Comments reflect the views of the original submitter only.