Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | boxculvert, cambridge, chisholmtrail, newmarketroad |
Date time: | 4.42pm, Sunday 28th March, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
The Chief Engineer and colleague watch as the sixth box culvert (of fourteen) is lowered into place at Newmarket Road.
This is a week long closure of the road to build the underpass for the Chisholm Trail.
Comments reflect the views of the original submitter only.