Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 9.42am, Thursday 22nd May, 2008 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Area: | Cambridge |
There are two rest areas on the northern approach to the Riverside bridge - one on the pedestrian side, and this one by the cycle track - this may cause conflicts.
Comments reflect the views of the original submitter only.