Gallery: CEoGBFieldTrip2011
Photos from the Cycling Embassy of Great Britain's visit to the Netherlands to take part in David Hembrow's Cycle Study Tour. The study tour ran over three days in September, 20th to 22nd.
Raised table crossroads in 30kph zone showing 'No Entry except cycles and mopeds' and 'No Parking' signs. The no parking applies to the side of the street the sign is on.
A raised table crossroad in 30kph zone with 'No Parking' sign and "One Way except cycles and mopeds' sign. The no parking applies to the side of the street the sign is on.
Raised table crossing in a 30kph zone showing 'No Entry except cycles and mopeds' and 'No Parking' signs. The parking restriction applies to the side of the street the sign is on.
Crossing without cycle priority
Underpass 'crossing' 70kph 'no cycling' road
Underpass 'crossing' 70kph 'no cycling' road
Underpass 'crossing' 70pkh 'no cycling' road
Underpass 'crossing' 70pkh 'no cycling' road
Rubbish bin designed for passing cyclists to use (school nearby)
Secondary school cycle parking
Leisure cycle network map at point 61
Route to point 63 is 'the worst cycle path in Drenthe'.
Car barrier - busses can pass.
Paved 30kph zone with plenty of off-road car parking.
Cycle bridge over water feature.
Bollard preventing car access onto concrete cycle path.
Cycle parking at bus stop.
Informal cycle parking inside covered shopping mall.
Road in 30kph zone made a no through route fro cars using bollards. Only one entry/exit for cars.
Raised table where cycle path meets 'no through route' road in 30kph zone. Cycle path straight ahead.
T junction of cycle path meeting another branch of 'no through route' 30kph road.
30kph road with cycle lanes ends and continues as cycle path under bridge.
View South from mound next to canal.
View SE from mound next to canal.
View West from mound next to canal.
View NNE from mound next to canal.
4m cycle path alongside canal.
4m cycle path alongside canal.
4m cycle path alongside canal.
Preparing for a game of Hopscotch.
Cycle parking at bus stop.
Cycle path en route to industrial estate.
Cycle path over bridge en route to industrial estate.
Cycle path crossing (without priority) alongside zebra crossing.
Cycle path crossing (without priority) alongside zebra crossing.
Light controlled crossroads with 'free for all' single green phase for cyclists.
Couldn't have put it better. This is a car free street.
Outdoor cycle parking at Assen station (there's secure indoor parking too).
Raised table at crossroads of paved roads.
* Items marked with an asterisk [*] are required fields and must be fully completed.